HEARTLAND Protocol FHIR Implementation Guide
0.1.0 - ci-build
HEARTLAND Protocol FHIR Implementation Guide - Compilação de desenvolvimento local (v0.1.0) construída pelas ferramentas de compilação FHIR (HL7® FHIR® Standard). Veja o Diretório de versões publicadas
Perfil: HEARTLAND Care Plan
HEARTLAND Facility Implementation Tier: Tier 2 - Standard
HEARTLAND Monitoring Track Assignment: Analog Track B
status: Active
intent: Plan
period: 2026-04-16 --> 2026-07-16
activity
Details
Status Scheduled[x] Description Not Started Uma vez Initiate all 4 GDMT classes (ARNI/ACEi/ARB, beta-blocker, MRA, SGLT2i) within 14 days per Tier 2 protocol. Prioritize SGLT2i and beta-blocker first if simultaneous initiation not feasible.
activity
Details
Status Scheduled[x] Description Scheduled Uma vez Post-discharge contact within 48 hours by RN champion.
activity
Details
Status Description Scheduled 7-day in-person follow-up visit at FQHC for vitals, medication reconciliation, and GDMT titration.
activity
Details
Status Scheduled[x] Description Scheduled Contagem 4 times, Uma vez por 1 week Weekly follow-up phone calls x 4 weeks (Track B analog) capturing weight, blood pressure, oxygen saturation, and symptom assessment.
activity
Details
Status Description Scheduled Full discharge teach-back covering 8 AHA-aligned domains: (1) daily weight monitoring, (2) sodium and fluid restriction (<=2 g/day Na, 1.5-2 L fluid), (3) medication adherence and timing, (4) symptom recognition (red flags), (5) activity and exercise progression, (6) when to call provider vs ED, (7) follow-up appointment plan, (8) self-care between visits.
activity
Details
Status Description Scheduled Patient assistance program (PAP) pursuit + Generic Bridge for medication access. Generic therapy is superior to no therapy; never delay treatment while waiting for paperwork.
note:
Tier 2 protocol: full implementation over 12 months with phased rollout. Quality metrics: dose optimization and 30-day readmission reduction.